Subject: Monday's non-shutdown of front elevator
From: Jim Thomas (jthomas@math.niu.edu)
Date: Thu Apr 15 2010 - 11:34:04 CDT
Some of you may have noticed that the front elevator wasn't shut down.
1P cancelled the work on principle after learning that the cost of
buffering/sealing the elevator floor, while fairly modest, was still
twice what it should have cost. That's why the floor still looks a bit
grungy. The current plan is to wait until the buildings rugs are cleaned
in the near future.
Jim
This archive was generated by hypermail 2b28 : Sun May 16 2010 - 15:18:53 CDT